Oregon APEX Accelerator

Interstate Bridge Replacement opportunity

Date: 09/11/2026

YOU ARE INVITED TO A VIRTUAL SUBCONTRACTOR & SUPPLIER OUTREACH EVENT FOR THE COLUMBIA RIVER BRIDGE REPLACEMENT PROJECT

A COMPONENT OF THE INTERSTATE BRIDGE REPLACEMENT PROGRAM

When: Wednesday September 16th 1:00 AM

Where: Virtual

Columbia River Constructors a JV (CRC), a joint venture between Kiewit, Guy F. Atkinson Construction, and Traylor Bros., Inc. is preparing to respond to the Request for Qualifications for the Columbia River Bridge Replacement Project, issued by the Washington State Department of Transportation (WSDOT).

The Project is a major component of the Interstate Bridge Replacement (IBR) Program, replacing the existing I-5 bridges between Portland, Oregon and Vancouver, Washington with two new multimodal crossings. The scope of work includes upgraded highway connections, reconstructed interchanges, enhanced local roadway networks, a shared-use bicycle and pedestrian path, and accommodations for future light rail transit. Construction will be phased to maintain traffic flow, incorporate a modern tolling system, and remove the existing bridge structures.

Please join to hear from our leadership team about the Project, anticipated contracting opportunities, and how your firm can get involved.

For more information and to register click here.

Ends 09/15/2026 05:00 PM